Underpinning The Annex Victorian Semi — Full Perimeter Underpinning
180 linear feet of perimeter underpinning on a 1920s Victorian semi. Staged pin-sequence excavation, engineered footing extensions, permit closed in 11 weeks.
Scope: Engineered footing extension, 8 ft conversion