Documented Project: Mississauga, Peel Region

Large Detached Deep Lowering Project in Erin Mills, Mississauga

Deep lowering for a legal duplex conversion required the maximum allowable depth under local soil-bearing capacity and continuous engineering oversight. Completed by Toronto Basement Underpinning in August 2024. Fixed-price contract, engineered drawings and Peel Region permit coordination included.

Licensed & Insured
Free Estimate Within 2 Hours
Workmanship Warranty on Every Project
GTA-Wide Service
Large Detached Deep Lowering worksite in Erin Mills, Mississauga, ON - Full perimeter deep lowering for legal duplex
KEY STATS Project Success Metrics
Delivered on time and within budget
9.9/10
Total project cost
$75,000
Local labor
80%
Local supplier spend
100%
Building Stats
Basement size
1,420 sqft
New area gained
1,180 sqft
Linear footage underpinned
180 lin ft
Pins poured
32
Depth gain
2'10"
Original ceiling
5'2"
Finished ceiling
8'0"
Client
Homeowner in Mississauga
Completion
August 2024
Location
Erin Mills, Mississauga, ON
Sector
Residential
Permit turnaround
10 weeks
Warranty
10 years

Introduction

Deep lowering for a legal duplex conversion required the maximum allowable depth under local soil-bearing capacity and continuous engineering oversight. The property is a residential detached in Erin Mills, Mississauga, with an original 5'2" basement ceiling across a 1,420 sqft footprint. Our crews delivered a full perimeter deep lowering for legal duplex project under a fixed-price contract that bundled engineered drawings, Peel Region permit coordination, excavation, pin-by-pin underpinning, interior waterproofing, and new slab pour.

The scope lowered the basement by 2'10" to deliver a 8'0" finished ceiling across 1,180 sqft of newly usable standing-height basement area, directly enabling the homeowner's plan for a legal secondary use of the lower level.

The Underpinning Process

A controlled sequence of engineered steps delivered the Erin Mills project on time and within budget. Each phase passed Peel Region inspection before the next began.

1. Deep Assessment and Full Engineering

Deep-lowering projects require geotechnical confirmation of soil-bearing capacity to the target footing depth, written structural engineering sign-off, and settlement monitoring plan filed with the municipality before mobilisation.

2. Excavation

Pin-by-pin excavation along 180 linear feet of perimeter to 2.83 feet below the original slab. Strict alternating segment sequence to maintain continuous support.

3. Underpinning Pits

Mass-poured concrete footings at the maximum depth allowed by the soil assessment, each pit confirmed by the structural engineer before pour.

4. Steel Reinforcement

Heavy 15M rebar cages with additional lateral ties for deep-column load transfer. Vertical dowels tied into the retained upper footing.

5. Structural Supports and Settlement Monitoring

Full-structure monitoring instrumentation installed and read daily. Settlement maintained within engineered tolerances throughout the six-week on-site phase.

6. Waterproofing and Drainage

Full perimeter interior Delta-MS, perforated weeping tile, dual sump pits with battery backup, and backwater valve installation on the main sewer connection.

7. Insulation and Finishing

New engineered slab poured over vapor barrier. Basement now has an 8-foot standing ceiling across the full 1,180 sqft of new living area, ready for legal duplex finishing trades.

Our Approach

Delivered on time and within budget. The Erin Mills project ran through several site challenges: lakeside port credit and cooksville sit on heavy lake iroquois clay that drives foundation settlement, while erin mills subdivisions built in the 1980s used engineered fill with more predictable underpinning conditions. We addressed each early by sourcing locally where material shortages hit, scheduling around weather windows, and running hydraulic jacks plus specialised concrete mixes during the deepest excavation phase. Modern waterproofing membranes replaced the aging drainage components, and the result is a basement that is both structurally sound and dry.

What's Included in This Project Scope

The fixed-price contract covered every item below. No line-item surprises, no change orders unless the homeowner added scope. One contract, one warranty, one crew.

  • Deep-lowering geotechnical soil-bearing capacity assessment
  • Full engineering package with settlement monitoring plan
  • City permit application and inspection coordination
  • Pin-by-pin excavation to maximum engineered depth
  • Mass-poured concrete footings with engineer sign-off per pit
  • Heavy 15M rebar cages with additional lateral ties
  • Full-structure monitoring instrumentation with daily reads
  • Full interior perimeter Delta-MS and perforated weeping tile
  • Dual sump pits with battery backup and backwater valve
  • Engineered reinforced slab pour over vapor barrier
  • Workmanship warranty on all structural work

Social Impact

Local engineer, local structural monitoring, local waste-haul trades, and 100% of structural materials sourced from Ontario suppliers. Reduced project transport footprint by an estimated 400 vehicle miles compared to an out-of-city crew.

Client Testimonials

Rated 4.9 stars across projects documented on the site.

★★★★★

""

Charles W., Forest Hill, Toronto
★★★★★

""

Olu A., Etobicoke, Toronto
★★★★★

""

Megan R., The Annex, Toronto

Thinking About Underpinning in Mississauga?

Every project on this site is delivered on a fixed-price contract with engineered drawings, Peel Region permits, and a workmanship warranty included. The scope of your project may differ from this one - we size the quote to your actual building, soil, and depth-gain goal. Book a free site assessment and we respond within two business hours.